top of page


Restoration of Historic Victorian London Subway To Be Completed by August 2022
The majestic Grade II listed Crystal Palace subway will be returned to its formal glory following major works that will take place until the summer of 2022. The plan is to repair/rebuild existing walls, build new parapet walls, a roof structure, and transform the site into a multi-functional space that will be easily accessible throughout the year. When was the Crystal Palace subway built? First opened to the public in 1865, the Crystal Palace subway contains a spectacular se

Ina
Jan 17, 20222 min read
bottom of page